Pomeranian

 

  • calculation of indirect costs for bridge structures and tunnel under "martwa" Vistula river for project of two sections "TRASA SŁOWACKIEGO" in Gdańsk. (2011)
  • preparing of timetable for "Rebuilding of main railway station in Gdańsk Główny", Poland (2016)

Warmian-Masurian:

- calculation of indirect costs for bridge structures and acoustic screens for project "SZCZUCZYN BY-PASS". The project includes 9 bridge structures with different kind of main slab: steel structure, presstresed structure  and precasted beams as well. (2012)

Podlaskie:

Masovian:

- Bridges estimation for "RADOM BY-PASS" (2010)

- Preparing of bill of quantity with estimation for "Building LEROY MERLIN in Płock including infrastructure." (2013)

Lubusz:

-calculating of additional indirect costs during the execution for project "S3 by-pass"  as claim calculations   (2010)

 

-preparing of offer for project: building of borderbridge over Nysa river in Gubin  (2013). The Investor is german Landkreis Oder-Spree in Beeskow. German project.

Łódź:

-preparing of financial plan and cash-flow for one section of motorway A2 (2011)

- calculation of indirect costs for demolition works for project "RECONSTRUCTION OF RAILWAY STATION IN ŁÓDŹ FABRYCZNA" (2012)

Lublin:

- preparing of indirect costs calculation for bridge over Wistula river in Kamień. The main structure is planned as steel structure. (2012)

Świętokrzyskie:

- calculation of indirect costs for bridge structures  for project   "DW 786 ŁOPUSZNO" (2011)

- calculation of indirect costs for bridge structures for project "Elimination of barriers to development ? bridge over Vistula River with rebuilding of road DW No 764 and connection with road DW No 875". Bridge over Vistula river with 955m long steel structure  (2012)

Lesser Poland:

- calculation for breakdown of unit rates according to contract requirements for one section of A4 motorway (2010)

- preparing of proof calculations for claims of the Contractor for one section of A4 motorway  (2012)

- preparing of cost calculations together with offer documents for: Building of underground construction  for car  parking       in Focha street in Cracow. Project  "design and build". (2013)

- preparing of estimation for Investor for project: "Connections road with class GP for national road No. (Intersection for  Tarnowska and Witosa streets)  with  Marcinkowicka street (No. 25219) within border of the city Nowy Sacz (2013)

- preparing of  bill of quantity  and  cost  calculations for "Construction  of  the  warehouse of  general   purpose  for  police       in Rząska"  in  Poland. Three-floor building  96,91m x 35,50m planned partly for storage and partly for offices. The whole  project  includes  mainly  the building  but also parking area with the necessary infrastructure. (2016)


Silesian:

- calculation of direct costs for bridge structures and acoustic screens for project "PSZCZYNA BY-PASS" (2012)

- calculation of direct costs for bridge structures and acoustic screens for project "DTŚ Z3 and Z4 in ZABRZE" (2012)

- calculation of costs for rectification and repair works for several buildings located in areas of mining damage. Buildings of different designs: single-family houses and townhouses.   (2012)

- estimation of general costs for bridge structures, acoustic screens and retaining walls for project: "Building of by-pass of Pawłowice in the route of DW 933 as "main southern road""  (2012)

- estimation for Employer for project: Rebuilding of Zalogi street in Czestochowa. Scope of works: civil works, road works  (2013)

- calculation of costs for "Water reservoir RACIBÓRZ". About 10 milion m3 of embankments  and about  2 milion m3 of excavation works and about 80 000m3  of concrete (2013)

- calculation of costs for "Rebuilding of acoustic screens along the A4 motorway section from 333+832 to 336+052" (2015)

Opole:


Lower Silesian:

- calculation of indirect costs for bridge structures and acoustic screens for project "BRZEG DOLNY BY-PASS" (2011)

- calculation of costs for the Employer for project: "Upgrading of project for repair works on the bridge structure over Stara Odra on the route National Road No.12 km 123+732 and new project for temporary bypass".   Scope of works: road works, bridge works  (2013)

Podkarpackie:

- cost controll for indirect and direct costs directly on the site for project: "JAROSŁAW BY-PASS" (2011)

Baden-Wurttemberg:


Bayern:

- calculation of indirect costs for rebuilding of water level in Grossaiting in Germany  (2012)

- calculation of indirect costs for building of new overbridge no 113a in Bamberg in Germany. Designed construction: 3-spans frame with total lenght 66,25m  (2012)

Berlin:



Brandenburg:


Bremen:



Hamburg:



Hessen:

- calculation of indirect costs for rebuilding of existing bridge over Main river in Offenbach in Germany. New structure is designed as 233,76m long steel structure. This realisation will be executed by traffic on the temporary bridge, which will be build using old bridge structure by pushing on temporary supports. When the new bridge will be ready, the temporary structure will be demolished.  (2012)


Mecklenburg-Vorpommern:


Niedersachsen:

- calculation of indirect costs for rebuilding of bridge over Sieber river together with rebuilding of structure for pipes in Herzberg in Germany  (2012)


Nordrhein-Westfalen:


Rheinland-Pfalz:

- Ongoing settlement construction costs of railway line "UNTERE LAHN" 42km, Railway traffic control devices with 8 new control rooms and associated facilities, Germany (2014-2015)

Saarland:


Sachsen:

- calculation of indirect costs for rebuilding of existing bridge over Pleisse river in Markklleberg in Germany  (2012)


Sachsen-Anhalt:


Schleswig-Holstein:


Thuringen: